How WPC Doors Are Installed: Step by Step
Babeco · 2026

How is a WPC door installed?
A WPC door goes in at the very end of finishing: the frame is set in the opening, levelled and fixed with foam, then the leaf is hung and the handle and lock are fitted, and the door stays closed for 24 hours while the foam cures. Babeco installs your doors through independent installers we arrange, and up to six doors are usually installed in one day.
Who installs your doors
Babeco installs the doors you buy from us. We arrange the installation through our installers when you order, and an installation supervisor contacts you before the work starts. Please raise any question or issue with the supervisor, not directly with the technician on site.
Our installers are independent professionals whom we engage and pay; they are not factory employees. If an installer is late or cannot attend at the agreed time, we set a new installation date as soon as possible. Our sales team explains this before you pay, and it is written in the installation terms you sign.
Before installation day
- The walls are finished and plumb, and the parquet and bathroom thresholds are already in place. See when to install doors.
- No other trades are working on site that day.
- The doors are stored lying flat on the ground, never standing upright.
- All accessories — hinges, handles and locks — are on site.
- You have confirmed the opening sizes, the wall thickness and the swing direction of each door with our team.
- You or a person representing you will be present for installation and handover.
Sizes and wall thickness
The standard frame fits walls 15–19 cm thick. For a thicker wall we make a frame extension in advance at 250 EGP per extra centimetre, so tell us when you order. Small gaps around the frame are filled with fixing foam (an extra bottle is 150 EGP), and an opening smaller than standard is adjusted for 350 EGP. Our door opening sizes guide shows how to measure.
On the day
- The installer checks the openings against the doors and confirms the swing directions.
- The frame is set in the opening, levelled, and fixed with foam.
- The leaf is hung on its hinges and the handle and lock are fitted.
- If you ordered matching cladding, the casing and architrave are fitted around the door; this needs a level wall.
- Up to six doors are usually installed in one day; more than six take two working days.
The 24-hour rule
Leave every door closed and untouched for 24 hours after installation so the fixing foam can cure fully. Opening and closing it before then can move the frame.
Handover
Check each door with the team before you sign the handover record. Once it is signed, the doors are considered sound and later remarks are treated as maintenance, as set out in the terms. Then register your warranty on our website: lifetime against water, moisture, insects and termites, plus 10 years on the surface.
What can add cost
- A re-installation visit if the site is not ready, other trades are present or accessories are missing: 800 EGP per door.
- Reversing a door's projection after installation, at the customer's request: 800 EGP per door.
- An extension discovered only on the day: 350 EGP fitting per door plus transport.
Common questions
Does Babeco install the doors?
Yes. We arrange the installation through independent installers when you order, and an installation supervisor contacts you before the work starts; raise any question with the supervisor. The site must be ready, with walls finished and plumb, parquet and thresholds laid, accessories on site and no other trades working. The rules are in the installation terms.
How long does installation take?
Up to six doors are usually installed in one day; more than six take two working days. After that, each door must stay closed for 24 hours so the fixing foam cures. Plan the day when no other trades are on site, and be there, or send someone who represents you, for the handover.
Can I open the door right after installation?
No. Leave it closed and untouched for 24 hours so the fixing foam cures fully. Opening and closing it earlier can move the frame out of line, causing rubbing and gaps, and damage from opening it early is not covered by the warranty. After 24 hours, check each door with the team before signing the handover.
What if the installer does not come on time?
We set a new installation date as soon as possible. Installers are independent professionals whom we engage and pay, not factory employees, and our sales team explains this before you pay; it is also written in the installation terms you sign. Contact the installation supervisor with any change, rather than the technician directly.
How are WPC doors installed?
In four steps at the end of finishing: the frame is set in the opening, levelled and fixed with foam; the leaf is hung on its hinges; the handle and lock are fitted, with cladding if ordered; and the door stays closed for 24 hours while the foam cures. Babeco arranges the installation when you order.