How is a WPC door installed?
The frame is set in the opening, levelled and fixed with foam, then the leaf is hung on its hinges and the door is left closed for 24 hours while the foam cures. Babeco installs the doors it sells through installers it arranges; up to six doors are usually done in one day.

Before installation day
Walls finished and plumb, parquet and bathroom thresholds already in place, no other trades on site, doors stored lying flat and all accessories on site. See when to install doors.
Who installs
We arrange the installation through independent installers whom we engage and pay; an installation supervisor contacts you before the work. The full steps are in how WPC doors are installed.
After installation
Keep each door closed for 24 hours, check every door before you sign the handover record, then register your warranty on our website.
People also ask
Does Babeco install the doors?
Yes, through installers we arrange when you order.
Before or after the parquet?
After. Doors fitted first rub against the new floor.
How long does it take?
Up to six doors usually take one day; more than six take two working days.